Footbridge Project
August 2015 // The local Board of Directors for community development projects, the Cooperative Guardianes del Bosque and Global Works all contributed to the footbridge project. The old bridge was in a state of disrepair; much of the wood was rotten and decomposing. Together, with the help of over 30 community members, the footbridge was replaced with a new concrete bridge!
June 2016 // Students from Piedmont High School in Piedmont, California added handrails to the existing concrete bridge.
June 2016 // Students from Piedmont High School in Piedmont, California added handrails to the existing concrete bridge.